The EES is on Public Exhibition
The Environment Effects Statement (EES) and draft Planning Scheme Amendment (PSA) for the Hazelwood Rehabilitation Project are on public exhibition from Monday 21 September to 11:59 pm Monday 2 November 2026.
The EES is also available to view at:
Latrobe Valley GovHub at 65 Church Street, Morwell
TAFE Gippsland Traralgon campus at 49-63 Princes St, Traralgon
Sale Library at 70 Foster Street, Sale
State Library Victoria at 328 Swanston Street, Melbourne
Make a submission
During the public exhibition period, anyone can make a written submission on the EES. The submission process is independently managed by Planning Panels Victoria (PPV).
Submissions must be made in writing and received by 11:59 pm on Monday 2 November via the Engage Victoria website. You can access the Engage Victoria Submission form with the following link: https://engage.vic.gov.au/Hazelwood-Rehabilitation-Project-IAC
If you do not have internet access and are unable to lodge a submission online, contact PPV through the Customer Call Centre on 136 186 (select option 6) and request a hardcopy submission coversheet.
We are hosting two drop-in community information sessions in Morwell, where we will be available to answer questions about the project and the EES. To find out more about upcoming EES events, visit our Events page.
About the Environment Effects Statement Process
ENGIE Hazelwood is progressing a comprehensive and transparent
planning and consultation process for the Hazelwood Rehabilitation
Project Environment Effects Statement (EES).
The EES process is managed by the Victorian Department of Transport and Planning (DTP) on behalf of the Minister for the Planning.
Central to the success of the Hazelwood Rehabilitation Project is minimising potential impacts and protecting important natural systems.
The project was referred by ENGIE Hazelwood to the Minister for Planning. In February 2022, the Minister for Planning determined an EES would be required for the Hazelwood Rehabilitation Project.
The environmental assessments for the EES have now been completed and are on public exhibition.
View the project’s Environment Effects Statement introduction video and fact sheet to learn more about the EES process.
What has been assessed?
The matters that have been assessed in the EES were set out in the Scoping Requirements prepared by the Department of Transport and Planning and include:
Water resources and environmental values
Landform, safety and stability
Amenity, socio-economic and land use
Cultural Heritage
Biodiversity and ecological value
Steps in the Environment Effects Statement process
Frequently asked questions
An EES is a well-established process under the Environment Effects Act 1978, that provides a comprehensive framework for assessing projects with potential for significant environmental effects.
The ministerial guidelines for assessment of environmental effects define the environment as the physical, biological, heritage, cultural, social, health, safety and economic aspects of human surroundings. All of these are considered in the EES.
The guidelines state the objective of the assessment process is to provide for the transparent, integrated and timely assessment of project capable of having a significant effect on the environment.
The Hazelwood Rehabilitation Project EES includes a summary brochure, the main report with chapters that summarise each technical report and other key topics, detailed technical reports, and attachments. The main report is made up of chapters in three parts:
Part 1 provides an introduction to the project, including why it is needed, how it has been developed, the alternatives considered, and the planning and assessment framework. It also summarises community and stakeholder engagement and the main issues raised.
Part 2 includes chapters on each of the environmental assessments:
Climate change
Water resource use and regulation
Lake water balance and water quality
Catchments, rivers and wetlands
Groundwater
Land and solid waste
Ground movement and geotechnical hazards
Ecology
Aboriginal cultural heritage
Historical heritage
Air quality
Noise and vibration
Landscape and visual
Land use
Socio-economic impact
Mine fire risk
Transport
Part 3 brings together key findings on Matters of National Environmental Significance, an integrated assessment on the project scenarios, and ENGIE Hazelwood’s environmental commitments to the project.
Each chapter is supported by detailed technical reports. The reports outline the detailed studies undertaken to understand the potential impacts of the project and ensure that the Scoping Requirements have been addressed.
The Attachments include several supporting documents that inform the EES but are not technical reports, such as the EES Consultation Report, the draft Planning Scheme Amendment, and the draft Declared Mine Rehabilitation Plan.
There are several ways you can view the EES:
On the View the EES page of this website
Printed copies are available to view at the Latrobe GovHub in Morwell, the Gippsland TAFE Traralgon campus, the Sale Library, and State Library Victoria.
Printed summary reports are available for free at the venues above and at the Latrobe City Council offices in Morwell and Traralgon.
The complete EES on a memory stick will also be available at these venues.
During the public exhibition period, anyone can make a written submission on the EES. The submission process is independently managed by Planning Panels Victoria (PPV).
Submissions must be made in writing and received by the exhibition closing date via the Engage Victoria website, using this link: https://engage.vic.gov.au/Hazelwood-Rehabilitation-Project-IAC
Submissions received during the EES exhibition will be considered by an Inquiry and Advisory Committee (IAC) appointed by the Minister for Planning. After the exhibition period, an Inquiry will be held, where people and organisations who have made submissions may be given the opportunity to present to the IAC.
To ensure the safety, stability and amenity of the Hazelwood site, final rehabilitation works in some form are required. The EES will assess which of the available options provide an acceptable outcome.
The Minister for Planning will provide a final assessment of the effects of the Project. The assessment will consider all relevant information including the EES documents, public submissions, ENGIE Hazelwood’s response and an inquiry report.
This information and the Minister’s assessment - as to whether the Project provides an acceptable outcome - must be considered by other government agencies who make statutory approvals decisions in relation to specific aspects of the Project.
These agencies will decide whether to approve the Project under Victorian law.